An uneven bluestone patio is not just an eyesore; it’s a tripping hazard and a sign that water is pooling where it shouldn’t. This guide walks you through the process of leveling individual stones or re-setting a larger section, restoring a safe, flat surface that drains properly. Before you start, assess the extent of the problem: if only a few stones are rocking or settled, you can lift and re-bed them; if a large area has sunk, you may need to relay the whole section.
What You’ll Need
- Safety glasses and work gloves
- Pry bar or flat shovel (for lifting stones)
- Wheelbarrow or tarp (to hold excavated material)
- Stone dust or coarse sand (for bedding)
- Crushed stone or gravel (for base repair, if needed)
- Rubber mallet or dead-blow hammer
- 4-foot level or straightedge
- Broom and hose (for cleaning joints)
- Polymeric sand or jointing sand (for re-sanding)
- Plate compactor (for large areas, optional)
- Chalk line or string line
Step-by-Step
- Identify the problem stones. Walk the patio and mark any stones that rock, are noticeably higher or lower than neighbors, or have gaps where water collects. Use chalk to outline them.
- Clear the area. Remove any furniture, planters, or debris. Sweep the joints around the affected stones to expose the edges.
- Lift the uneven stones. Insert a pry bar or flat shovel under the edge of the stone. Gently lever it up, using a block of wood as a fulcrum if needed. For larger stones, get help to avoid injury. Set the stone aside on a tarp.
- Inspect the base. Once the stone is out, check the bedding material underneath. If it’s soft, muddy, or has voids, you’ll need to replace it. Dig out any loose or contaminated material down to a firm layer.
- Repair the base (if needed). If the sub-base has sunk, add a few inches of crushed stone and compact it with a hand tamper or plate compactor. Then add a layer of stone dust or coarse sand, about an inch thick, and level it with a straightedge. The bedding should be slightly higher than the desired final height, as it will settle.
- Set the stone. Place the bluestone back into the opening. Use a rubber mallet to tap it down to the correct height. Check with a level: the stone should be level in both directions, and its top should be flush with adjacent stones. Aim for a slight slope (about a quarter-inch over a few feet) away from the house or structure for drainage.
- Check the fit. Step on the stone to ensure it doesn’t rock. If it does, lift it again and add or remove bedding material. Repeat until it’s stable and level.
- Fill the joints. Sweep polymeric sand or regular jointing sand into the gaps between stones. For polymeric sand, follow the manufacturer’s instructions (usually involves wetting with a fine mist). For regular sand, just sweep it in and tamp it down.
- Compact and settle. For a small repair, you can simply walk over the area. For a larger section, use a plate compactor to settle the sand and stones. Be careful not to crack the bluestone; use a rubber pad under the compactor if necessary.
- Clean up. Sweep off any excess sand and hose down the patio gently to remove dust. Allow the area to dry completely before using it.
Common Mistakes
- Not addressing drainage. If you level a stone without ensuring water can flow away, you’ll create a new puddle. Always maintain a slight slope.
- Using the wrong bedding. Straight dirt or sand without proper compaction will settle again quickly. Use a compacted base of crushed stone topped with stone dust.
- Lifting stones without help. Bluestone is heavy; trying to lift a large slab alone can cause injury or cracking.
- Skipping the level check. Eyeballing the height often leads to a stone that’s too high or too low. Always use a level and a straightedge.
- Over-wetting polymeric sand. Too much water can wash the sand out of the joints or leave a haze on the stone surface.
Tips
- Work in the morning or late afternoon to avoid heat stress, and keep the stones cool by misting them with water if they’re hot to the touch.
- Number the stones with chalk before lifting them so you know where they go back.
- If you’re repairing a large area, rent a plate compactor and a small skid steer or use a hand tamper for a more controlled job.
- Use a straightedge across several stones to ensure a smooth, even surface, not just a level on a single stone.
- For stubborn stones that are too high, you may need to grind the bottom down with a masonry grinder, but this is a last resort.
Troubleshooting
Stone still rocks after re-bedding. This usually means the base is not compacted enough. Remove the stone, compact the bedding material more firmly, and add a little more stone dust, then re-set and re-check.
Water pools in the middle of the patio. If the entire patio has settled, you may need to re-grade the whole area. This is a bigger job: lift all stones, add base material to create a proper slope, and relay them.
Stones are cracked. Cracks can be repaired with a masonry epoxy or a concrete patch, but if the crack is severe, the stone should be replaced. Match the new stone’s thickness and color as closely as possible.
Joints keep washing out. If sand washes away, the joints may be too wide or the sand is not suitable. Use a polymeric sand designed for wider joints, and make sure the edges of the stones are clean and dry before applying.
Patio is uneven but stones are intact. This could be due to tree roots or frost heave. For roots, you may need to cut the root and install a root barrier. For frost heave, the only permanent fix is to dig down below the frost line and rebuild the base, which is a major project.
Frequently Asked Questions
Can I just add sand to raise a low stone? Yes, but only temporarily. Adding sand without lifting the stone will not compact properly and will wash or blow away, so the stone will sink again. It’s better to lift and re-bed.
How do I know if I need to replace the base? If the base is soft, muddy, or has voids, it needs to be replaced. If it’s firm and well-drained, you can just add a fresh layer of bedding on top.
What’s the best bedding material for bluestone? A compacted layer of crushed stone (like 3/4-inch minus) topped with a 1-inch layer of stone dust or coarse sand is standard. The stone dust locks together and provides a stable bed.
Can I use a plate compactor on bluestone? Yes, but use a rubber pad or a layer of plywood to protect the stone surface. Avoid running the compactor directly on the bluestone, as it can crack.
How long does a repair take? For a few stones, a few hours. For a larger section, plan on a full day or more, depending on the size and the condition of the base.
Should I seal my bluestone after repair? Sealing is optional. It can help prevent staining and make cleaning easier, but it changes the appearance (often darkening the stone). Test a small area first.